Fresh paint, minimal wear and tear since renovations in 2023. Home was taken down to the studs & inspected by the city throughout the process which began 2/2023 & was completed 7/2023. New drywall throughout most of the home (with the exception of the paneling on stairs & back hall by garage). New electrical wiring. A/C plugs upstairs are on their own electrical circuit. New insulation throughout. Hot water tank 2021. New garage roof and front porch roof 2023. New gutters (Leaf Fitter) 2024. New concrete cap/foundation repaired on front porch 2025. New gutter extensions 2026. New kitchen & appliances included (fridge & dishwasher 2023). Two bedrooms (1 bdrm is large & could be split /converted to make a 3rd bdrm if needed). Full bath upstairs & quarter bath on the 1st floor. Convenient mudroom between garage & kitchen. Full basement. Attached garage. Fenced yard. Delayed negotiations until Wednesday 9/30/2026 at 11am.